Clearing, earthwork, utilities, and grading in the order they actually happen, and where projects usually lose time.
The sequence that keeps a site moving
Site work has an order for a reason. Clearing and erosion control first, then bulk earthwork to rough grade, then utilities while the site is still open, then structural fill, then fine grading and surfaces.
Where schedules slip
Permits and utility coordination started too late
Weather windows missed because earthwork waited on design
Unexpected ledge or groundwater, which we probe for early
Multiple subcontractors waiting on each other between phases
Because we self-perform clearing, earthwork, utilities, and paving, most of those hand-off delays simply do not exist on our jobs.
If you are weighing this on your own property in Hadley, Amherst, Northampton, or anywhere else across the Pioneer Valley, call A&M Construction Enterprises at (413) 374-5714. We will walk the site with you, tell you plainly what the ground is doing, and put an honest written scope together. We answer the phone and we will tell you when the work can wait as readily as when it cannot.
What we need from you before we start
Approved plans, a clear property line, and any known constraints save weeks. If there is an old septic system, a buried oil tank, a well, or a wetland flag anywhere on the parcel, tell us on the first walk rather than after the machines arrive. We can design around almost anything if we know about it early. Discovering it mid-dig is what turns a predictable schedule into a change order and a stalled site.